Once the order of installing various supplies has been given, a technician (preferably the available one with the highest rank) must do so as soon as possible. During the assignment, other members of the engineering may help the technician in case he has no other comrades around. Once the respective equipment (which can be found in the hangar bay) is installed, the leader of the assignment must fill in the following format for a report (in a different topic):
Installation starting time & date:
Installation ending time & date:
Installed equipment:
Assignment leader:
Assignment assistants:
Assignment status:
Assignment report: